THE GEISERZONE Field Operations
Connecting
Executive briefs
Wednesday, July 29, 2026

Donut
Run.

One car. Twenty-five stops. A north-to-south Bay Area sweep built to keep the boxes fresh and the route moving.

26Organizations
25Physical stops
99Miles from meetup
0Delivered

Before the boxes leave the shop

First drop at 8:00 AMStart at Veracyte, 6000 Shoreline Court. Allow about 14 free-flow minutes from Daly City BART. At five minutes per site, the modeled final drop is 1:10 PM.
Label the shared stopThe two SK hynix deliveries use adjacent offices.
Known exclusionPhoto Holdings remains off-route because a current Redwood City delivery address could not be verified.